薄壁箱梁剪力滞效应分析
首发时间:2013-01-30
摘要:本文首先将压弯荷载剪力滞效应的原理进行了综述,理清了概念,运用有限元软件ANSYS对某薄壁箱梁的剪力滞效应进行数值分析,与相关文献数值解、实测值和理论值进行对比,验证了模型的正确性,然后通过分析压弯箱梁本身受力特点,得到各影响因素对于其剪力滞系数的影响,并总结剪力滞系数沿跨径纵向分布的规律。再进一步分析了仅轴力、纯弯作用下剪力滞系数的纵向分布和翼缘板剪力流的关系,然后结合工程实践中的恒载和活载和预应力三者进行对比分析,得出全预应力结构有均衡剪力滞系数纵向分布及降低峰值的优点,对于工程实践有一定的理论帮助;最后本文对箱梁进入塑性状态后的剪力滞效应进行了研究并得出了相应结论。
For information in English, please click here
Analysis of Shear Lag Effect in Thin-walled Box Girder
Abstract:Firstly, the principle of the bending load shear lag effect were reviewed, Use software ANSYS for numerical analysis of a thin-walled box girder shear lag effect, compared with numerical solution of literature , the measured and theoretical values, verifyed the correctness of the model. Then through Mechanical characteristics analysis of bending box girder,obtained each factor for shear lag coefficient,and summarized the shear lag coefficient vertical distribution laws along the span.Further analyzed the relationship of Longitudinal distribution of shear lag coefficient and the flange plate shear flow in the case of axial force only and pure bending.Then combined with engineering practice,caculated the case under dead load ,live load and prestressed for comparative analysis. full prestressed structure can reduce the peak of shear lag coefficient.The conclusion was helpful for engineering practice. Finally, discussed shear lag effect of box girder plastic state and draw the appropriate conclusions.
Keywords: bending load prestressed shear lag coefficient vertical distribution plastic stage
基金:
论文图表:
引用

No.****
同行评议
共计0人参与
勘误表
薄壁箱梁剪力滞效应分析
评论
全部评论